CLIENT REPORTING
A clear record.
A useful handover.
Sample daily occurrence and incident reports, based on Harrier’s existing report templates.
Fictional demonstration only. Not a record of a Harrier assignment, client, employee or actual incident. Report format, recipients and delivery frequency are agreed for each site.
Real reports should record factual observations and actions, identify notifications, and assign follow-up without unnecessary personal details. The example shows a wet-floor hazard and its handover.
DAILY OCCURRENCE REPORT
The shift record.
- Report reference
- DEMO-DOR-20261012-DAY
- Site and location
- DEMO-01 | Fictional commercial property, GTA
- Guard and assigned post
- Demo Guard A | DEMO-EMP-01 | No real guard licence number | Main entrance | Demonstration post orders DEMO-PO-v1
- Shift and time zone
- 2026-10-12 08:00-16:00 EDT | America/Toronto (EDT)
- Actual attendance and relief
- 08:00 arrival; 16:00 relief and departure
- Opening handover
- Received handover from Demo Guard B. No outstanding issue reported at handover.
- Keys, equipment and safety check
- Demonstration radio and notebook checked. No keys issued for this example.
Occurrence log
| Time (EDT) | Observation, action and report reference | Initials |
|---|---|---|
| 08:00 | Received handover and checked assigned post and communication equipment. | DA |
| 08:20 | Checked the designated lobby and east entrance route; no reportable issue observed on that check. | DA |
| 09:05 | Visitor directed to reception under the demonstration entry procedure. No identifying visitor details included in this public example. | DA |
| 10:15 | Observed water on the east lobby floor. Kept pedestrians clear of the affected area and notified the site contact. See DEMO-INC-20261012-01. | DA |
| 10:35 | Site cleaner removed the water and left a warning sign. Site contact confirmed the area could reopen at 10:40. | DA |
| 12:00 | Demo Guard B assumed the post for break relief. Break ended and handover completed at 12:30. | DA |
| 14:10 | Completed the designated common-area check. No new reportable issue observed on that check. | DA |
| 16:00 | Handover completed to Demo Guard B. Maintenance follow-up remains with the site contact; incident reference supplied. | DA |
Handover and supervisor review
- Breaks and relief
- 12:00-12:30; Demo Guard B provided relief.
- Closing handover
- Post handed over at 16:00 to Demo Guard B. Entrance clear at handover.
- Unresolved issues and owner
- Site contact to arrange an entrance-mat and water-source check by 2026-10-13; incoming guard advised.
- Related reports
- DEMO-INC-20261012-01; no use-of-force report in this example.
- Guard submission
- Demo Guard A | 2026-10-12 16:10 EDT | Demonstration, unsigned
- Supervisor review
- Demo Supervisor | 2026-10-12 16:30 EDT | Follow-up assigned to site contact; demonstration, unsigned
INCIDENT REPORT
The event and follow-up.
- Incident reference and related DOR
- DEMO-INC-20261012-01 | DEMO-DOR-20261012-DAY
- Location and type
- East lobby entrance at DEMO-01 | Other: wet-floor hazard
- Occurred and prepared
- 2026-10-12 10:15 EDT | Prepared 2026-10-12 11:00 EDT
- Reporting guard
- Demo Guard A | DEMO-EMP-01 | No real guard licence number
- Initial observations
- At 10:15, Demo Guard A observed water on the floor near the east entrance mat. No fall or injury was observed or reported during this example. The source of the water was not determined by the guard.
- Persons involved
- Demo Guard A; site contact and site cleaner identified by role only.
- Witnesses
- None identified in this fictional example.
Chronology and actions
| Time (EDT) | Account and actions |
|---|---|
| 10:15 | Observed the water; redirected pedestrian traffic away from the affected floor area. |
| 10:18 | Notified the site contact by demonstration radio channel; requested cleaning and a warning sign. |
| 10:22 | Notified Demo Supervisor by telephone; supervisor instructed guard to maintain separation until site contact confirmed reopening. |
| 10:35 | Site cleaner removed the water and placed a wet-floor warning sign. |
| 10:40 | Site contact confirmed the area could reopen; guard resumed routine entrance duties. |
Evidence, notifications and review
- Force and injuries
- No physical contact or use of force. None observed or reported in this fictional example.
- Emergency services
- Police, fire and EMS not called: no emergency or injury observed or reported in this scenario.
- Current status
- Area reopened at 10:40 following site-contact confirmation. Cause and prevention measures require site maintenance review.
- Notifications
- 10:18 site contact (radio); 10:22 Demo Supervisor (telephone); instructions recorded in chronology.
- Evidence and related records
- Demo notebook entry DEMO-NB-01, pages 1-2. No actual photograph, CCTV file or evidence exists for this fictional example.
- Transfers and CCTV preservation
- No evidence transfer. No CCTV preservation request because this is a fictional demonstration.
- Corrective action and closure
- Site contact: review entrance mat and source of water by 2026-10-13. Demo Supervisor: check completion with site contact; closure not yet recorded in this example.
- Guard signature
- Demo Guard A | 2026-10-12 11:00 EDT | Demonstration, unsigned
- Supervisor and external-report assessment
- Demo Supervisor | 2026-10-12 16:30 EDT | Demonstration, unsigned. No actual notification or legal-reporting assessment is represented. Real events require assessment under the applicable procedure.
- Hold status
- No actual record or evidence hold: fictional demonstration only.
Let’s discuss your site.
Share the location, schedule and duties you need covered. Availability and the assignment scope must be confirmed before booking.