PRIVATE SECURITY • TORONTO & THE GTA

Director 1 · 647-573-0899Director 2 · 647-906-5757
Harrier Security Group
Home

CLIENT REPORTING

A clear record.
A useful handover.

Sample daily occurrence and incident reports, based on Harrier’s existing report templates.

FICTIONAL DEMONSTRATION

Fictional demonstration only. Not a record of a Harrier assignment, client, employee or actual incident. Report format, recipients and delivery frequency are agreed for each site.

Real reports should record factual observations and actions, identify notifications, and assign follow-up without unnecessary personal details. The example shows a wet-floor hazard and its handover.

DAILY OCCURRENCE REPORT

The shift record.

Report reference
DEMO-DOR-20261012-DAY
Site and location
DEMO-01 | Fictional commercial property, GTA
Guard and assigned post
Demo Guard A | DEMO-EMP-01 | No real guard licence number | Main entrance | Demonstration post orders DEMO-PO-v1
Shift and time zone
2026-10-12 08:00-16:00 EDT | America/Toronto (EDT)
Actual attendance and relief
08:00 arrival; 16:00 relief and departure
Opening handover
Received handover from Demo Guard B. No outstanding issue reported at handover.
Keys, equipment and safety check
Demonstration radio and notebook checked. No keys issued for this example.

Occurrence log

Time (EDT)Observation, action and report referenceInitials
08:00Received handover and checked assigned post and communication equipment.DA
08:20Checked the designated lobby and east entrance route; no reportable issue observed on that check.DA
09:05Visitor directed to reception under the demonstration entry procedure. No identifying visitor details included in this public example.DA
10:15Observed water on the east lobby floor. Kept pedestrians clear of the affected area and notified the site contact. See DEMO-INC-20261012-01.DA
10:35Site cleaner removed the water and left a warning sign. Site contact confirmed the area could reopen at 10:40.DA
12:00Demo Guard B assumed the post for break relief. Break ended and handover completed at 12:30.DA
14:10Completed the designated common-area check. No new reportable issue observed on that check.DA
16:00Handover completed to Demo Guard B. Maintenance follow-up remains with the site contact; incident reference supplied.DA

Handover and supervisor review

Breaks and relief
12:00-12:30; Demo Guard B provided relief.
Closing handover
Post handed over at 16:00 to Demo Guard B. Entrance clear at handover.
Unresolved issues and owner
Site contact to arrange an entrance-mat and water-source check by 2026-10-13; incoming guard advised.
Related reports
DEMO-INC-20261012-01; no use-of-force report in this example.
Guard submission
Demo Guard A | 2026-10-12 16:10 EDT | Demonstration, unsigned
Supervisor review
Demo Supervisor | 2026-10-12 16:30 EDT | Follow-up assigned to site contact; demonstration, unsigned

INCIDENT REPORT

The event and follow-up.

Incident reference and related DOR
DEMO-INC-20261012-01 | DEMO-DOR-20261012-DAY
Location and type
East lobby entrance at DEMO-01 | Other: wet-floor hazard
Occurred and prepared
2026-10-12 10:15 EDT | Prepared 2026-10-12 11:00 EDT
Reporting guard
Demo Guard A | DEMO-EMP-01 | No real guard licence number
Initial observations
At 10:15, Demo Guard A observed water on the floor near the east entrance mat. No fall or injury was observed or reported during this example. The source of the water was not determined by the guard.
Persons involved
Demo Guard A; site contact and site cleaner identified by role only.
Witnesses
None identified in this fictional example.

Chronology and actions

Time (EDT)Account and actions
10:15Observed the water; redirected pedestrian traffic away from the affected floor area.
10:18Notified the site contact by demonstration radio channel; requested cleaning and a warning sign.
10:22Notified Demo Supervisor by telephone; supervisor instructed guard to maintain separation until site contact confirmed reopening.
10:35Site cleaner removed the water and placed a wet-floor warning sign.
10:40Site contact confirmed the area could reopen; guard resumed routine entrance duties.

Evidence, notifications and review

Force and injuries
No physical contact or use of force. None observed or reported in this fictional example.
Emergency services
Police, fire and EMS not called: no emergency or injury observed or reported in this scenario.
Current status
Area reopened at 10:40 following site-contact confirmation. Cause and prevention measures require site maintenance review.
Notifications
10:18 site contact (radio); 10:22 Demo Supervisor (telephone); instructions recorded in chronology.
Evidence and related records
Demo notebook entry DEMO-NB-01, pages 1-2. No actual photograph, CCTV file or evidence exists for this fictional example.
Transfers and CCTV preservation
No evidence transfer. No CCTV preservation request because this is a fictional demonstration.
Corrective action and closure
Site contact: review entrance mat and source of water by 2026-10-13. Demo Supervisor: check completion with site contact; closure not yet recorded in this example.
Guard signature
Demo Guard A | 2026-10-12 11:00 EDT | Demonstration, unsigned
Supervisor and external-report assessment
Demo Supervisor | 2026-10-12 16:30 EDT | Demonstration, unsigned. No actual notification or legal-reporting assessment is represented. Real events require assessment under the applicable procedure.
Hold status
No actual record or evidence hold: fictional demonstration only.

Let’s discuss your site.

Share the location, schedule and duties you need covered. Availability and the assignment scope must be confirmed before booking.

Request a quotation